Federal Construction Contracting Guides
How federal construction contracting works, from bonding and Davis-Bacon wage requirements to responding to construction solicitations.
All Federal Construction Guides
How to Bid on Federal Construction Contracts: A Guide for Contractors
How federal construction contracts are bought and won: where to find them, sealed bids vs. proposals, set-asides, bonding, and what evaluators look for.
What Is a MATOC or MACC? Multiple-Award Construction Contracts Explained
How MATOCs and MACCs work: seed projects, task order competition, minimum guarantees, and why winning the contract is only the first step.
Two-Phase Design-Build Proposals Explained
How federal two-phase design-build selection works: Phase One qualifications, the shortlist, Phase Two technical and price proposals, and the design team.
Past Performance for Federal Construction Proposals
How past performance is evaluated in federal construction proposals: project minimums, CPARS and questionnaires, JV rules, and the quiet disqualifier.
Bonding, Davis-Bacon and Other Federal Construction Requirements
What every federal construction bidder needs to know: bid and Miller Act bonds, surety letters, Davis-Bacon wages, and subcontracting limits.
Joint Ventures for Federal Construction: SDVOSB, 8(a) and Small Business JVs
When a joint venture makes sense for federal construction, the SBA rules on size, work share and control, and what VA expects from SDVOSB joint ventures.
Book a Consultation with Pera
Get direct answers from the team that manages GSA MAS, OASIS+, and SeaPort NxG contracts every day.
Consultation Call
Talk through your GSA MAS, OASIS+, SeaPort NxG, or proposal questions with our team and leave with clear next steps.
Book 30 Minutes